CK Infrastructure Limited embodies an unwavering commitment to excellence, crafting structures that exemplify the highest quality standards. From the apex of towering edifices to the depth of foundational integrity, our dedication to superior craftsmanship resonates throughout. Meticulous planning and the utilization of premium materials define our approach, ensuring every project reflects our hallmark of distinction. We meticulously oversee every aspect, from the minutest detail to the grandest vision, guaranteeing each construction stands tall on the bedrock of unparalleled quality. Our relentless pursuit of perfection, from top to bottom, manifests in structures that not only meet but exceed industry benchmarks, setting a new standard of excellence that defines CK Infrastructure Limited.
Running Projects
Work Detail
Clients
Amount
Status
Request for Proposal for EPC Developer (Design & build) for construction of New Enterprises & Services tower (NEST) – 2AT SEEPZ – SEZ, Andheri E, Mumbai, Maharashtra.
SEEPZ
₹95,90,00,000.00
50%
Construction of Bairia Bus Stand, Muzaffarpur under Muzaffarpur Smart City Mission, Bihar.
BUIDCo.
₹137,59,14,480.00
10%
Snapshots of Our Projects.
M/s C.K. Infrastructures Ltd.
Completed Projects
Category
No.
Project Description
Gross Amount
Earth & Road Works
1
Construction of Master Plan Roads for the Relocation of Industries Project, Udyog Vihar, Bawana, Delhi
₹19,87,00,000
2
Four Laning and Strengthening of existing pavement on NH-2 SH. Earthwork, GSB, WMM and Construction of RCC Culverts
₹8,55,35,620
3
Widening & Strengthening of Gohana Lakhan Majra Meham Bhiwani Road Km. 16.00 to 69.77 in Rohtak and Bhiwani District
₹12,42,00,000
4
Remaining work of Widening and Strengthening of BankipurDanapur Road
₹5,60,47,654
5
Widening and Strengthening of Bailey Road, Gate Road in Km. 0.00 to 4.00 including Foot-path drain median, road kerb
₹16,09,97,432
6
Remaining work in development of Saguna More Junction of Bailey Road
₹7,26,66,648
7
Preparation of Land for Agricultural Cultivation purpose at Chandivali, Shrivali & Nandivali Village
₹36,52,15,000
8
Earth work Excavation of Trench in Hard Rock for laying of MS Pressure main & refilling of the trench
₹7,00,09,314
9
Construction of Cable Trenches & Civil Works Surrounding to Warehouses for Arshiya Northern FTWZ Ltd. FTWZ Project
₹4,33,67,347
10
Execution of the Traffic Restoration to N.H -28 from u.p Border Chainage 360.915 to chainage 440.000
₹29,72,61,613
11
Development of Narela Industrial Area with roads and drains
₹25,00,10,000
12
Development of Bawana Industrial Area with roads and drains
₹35,40,00,000
13
Construction of School and Road Development Budh Vihar
₹10,00,00,000
14
Long Term Output and Performance based Road Assets Maintenance Contract Work Package No. 37 / OPRMC / Gopalganj
₹37,00,00,000
15
Improvement (IRQP Work) cum output and performance based road Assets Maintenance Work of Chapwa- Harsidhi – Sewraha Road
₹45,00,00,000
16
Widening & Strengthening of Seragada – Badagada- Sorada Road, Km 56.00 to 95.900 KM Orissa
₹45,04,00,000
Building Works
1
Execution of Construction of Building including Internal Services, Roads, External Water Supply, Sewerage, Electrical Works, Rain Water Harvesting etc. complete for Defence Personal (Army) at Jodhpur
₹16,15,42,157
2
Construction of City Centre Phase – I, Sadar Bazar, Delhi Cantonment Board, Delhi
₹4,49,25,000
3
Construction of ROB and its approach at Tutikandi, Modern ISBT Tutikandi, Shimla on BOT Basis
₹39,98,690
4
Construction of Hotel Manali Resorts on Turn Key Basis